A conoid is a special kind of warped ruled surface which, as a curved shell roof, can be used as an alternative to a barrel vault. The basic principle is that one edge of the shell is curved while the opposite edge is kept straight. In architecture, this is referred to as a ‘right conoid’.
Two basic geometrical forms are encountered:
- A straight line is moved along a curved line at one end and a straight line at the other end, the resultant shape being cut to the required length.
- A straight line is moved along a curved line at one end and a different curved line at the other end.
The end consists of a reinforced concrete or steel lattice, which serves as a stiffening beam to prevent shell deformation. Support is required at all corners.
Spans of up to 12 m with chord lengths of up to 24 m are possible. The typical chord-to-span ratio is 2:1.
When conoids are made of reinforced concrete they require formwork on which to set the reinforcing steel and pour the concrete. The initial cost of making the formwork is usually high, but it can be reduced by pouring many shells on the same form.
There can be a solid infill or glazed end diaphragm. Glass panes set between adjacent conoids at the curved front of each conoid can allow for illumination. If the conoids face north they get the best natural light, which can be important for space such as factories.
Conoid shells are an ideal shape for cantilevered roofs covering the stands of stadiums with either a curvature up or a curvature down.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Anticlastic.
- Barrel vault.
- Cantilever.
- Folded plate construction.
- Hyperbolic paraboloid.
- Long span roof.
- Megastructure.
- Pendentive dome.
- Portal frame.
- Shell roof.
- Suspended ceiling.
- Synclastic.
- Tensile structures.
- Types of ceiling.
- Types of dome.
- The history of fabric structures.
[edit] External references
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2007)
- ‘The story of a right wavelet conoid’ , J. Dolezal (2011)
Synclastic.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February